|
||||||
Case Study: Hunterstown Power ProjectThis 890 MW combined cycle plant has a 350 MW steam turbine (down exhaust). Based in Hunterstown, Pennsylvania, the plant was placed into commercial operation in 2003.
|
||||||
|
||||||
Case Study: Hunterstown Power ProjectThis 890 MW combined cycle plant has a 350 MW steam turbine (down exhaust). Based in Hunterstown, Pennsylvania, the plant was placed into commercial operation in 2003.
|
||||||