PAC System Installations
| STATION OWNER (A/E) |
SIZE
[Mw(e)] (1) |
STEAM FLOW
[Lb/Hr] |
TURBINE BP
[IN HgA] |
DESIGN TEMP.
[deg. F] |
YEAR |
REMARKS |
Exeter Energy L. P. Project
Oxford Energy
Sterling, CT |
30
|
196,000
|
2.9
|
75
|
1989
|
PAC SYSTEM
(W-T-E)
|
|
Streeter Generating Station
Municipal Electric Utility
City of Cedar Falls, Iowa
Cedar Falls, Iowa
(Stanley Consultants)
|
40
|
246,000
|
3.5
|
50
|
1993
|
Converted Wet to PAC SYSTEM
(Combined Cycle)
|
Tucuman Power Station
Pluspetrol Energy, S.A.
El Bracho, Tucuman, Argentina
(Black & Veatch International)
|
150
|
1,150,000
|
5.0
|
99
|
1997
|
PAC SYSTEM
(Combined Cycle)
|
Grumman
TBG Cogen
Bethpage, NY
(General Electric)
|
13
|
105,700
|
5.4
|
59
|
1997
|
Converted ACC to PAC SYSTEM
(Combined Cycle)
|
SEMASS WTE Facility
American Ref-Fuel
Rochester, MA
(Bechtel, Inc.)
|
54
|
407,500
|
3.5
|
59
|
1999
|
Converted ACC to PAC SYSTEM
(W-T-E)
|
Goldendale Energy Project
Goldendale Energy, Inc.
Goldendale, Washington
(NEPCO)
|
110
|
678,000
|
4.5
|
90
|
2000
|
PAC SYSTEM
(Combined Cycle)
|
Comanche, Unit 3
Xcel Energy
Pueblo, Colorado
(Shaw Stone & Webster)
|
750
|
3,374,300
|
3.73
|
97
|
2006
|
PAC SYSTEM
(Coal Fired)
|
Afton Generating Station
Public Service of New Mexico
Las Cruces, New Mexico
(POWER Engineers)
|
148
|
594,981
|
5.0
|
98
|
2006
|
PAC SYSTEM
(Combined Cycle)
|
|
|
|
|