PAC System Installations

STATION OWNER (A/E) SIZE
[Mw(e)] (1)
STEAM FLOW
[Lb/Hr]
TURBINE BP
[IN HgA]
DESIGN TEMP.
[deg. F]
YEAR REMARKS
Exeter Energy L. P. Project
Oxford Energy

Sterling, CT

30

196,000

2.9

75

1989

PAC SYSTEM

(W-T-E)

Streeter Generating Station
Municipal Electric Utility

City of Cedar Falls, Iowa
Cedar Falls, Iowa

(Stanley Consultants)

40

246,000

3.5

50

1993

Converted Wet to PAC SYSTEM

(Combined Cycle)

Tucuman Power Station
Pluspetrol Energy, S.A.

El Bracho, Tucuman, Argentina

(Black & Veatch International)

150

1,150,000

5.0

99

1997

PAC SYSTEM

(Combined Cycle)

Grumman
TBG Cogen

Bethpage, NY
(General Electric)

13

105,700

5.4

59

1997

Converted ACC to PAC SYSTEM

(Combined Cycle)

SEMASS WTE Facility
American Ref-Fuel

Rochester, MA
(Bechtel, Inc.)

54

407,500

3.5

59

1999

Converted ACC to PAC SYSTEM

(W-T-E)

Goldendale Energy Project
Goldendale Energy, Inc.

Goldendale, Washington
(NEPCO)

110

678,000

4.5

90

2000

PAC SYSTEM

(Combined Cycle)

Comanche, Unit 3    
Xcel Energy

Pueblo, Colorado    
(Shaw Stone & Webster)

750

3,374,300

3.73

97

2006

PAC SYSTEM

(Coal Fired)

Afton Generating Station    
Public Service of New Mexico

Las Cruces, New Mexico
(POWER Engineers)

148

594,981

5.0

98

2006

PAC SYSTEM

(Combined Cycle)